Conrad Kacsik Blog

Understanding AMS2750E Is Key to Passing Nadcap Audits

Nov 27, 2018 4:28:01 PM / by Jason Schulze

0 Comments

Any business handling heat treating for aerospace customers is likely to face Nadcap audits. Manufacturers like Boeing and Airbus require Nadcap accreditation, so the vast supply chain of subcontractors handling aerospace products must meet and maintain Nadcap requirements.

Read More Understanding AMS2750E Is Key to Passing Nadcap Audits

Gaining Nadcap Approval | Conrad Kacsik

Oct 31, 2018 9:25:00 AM / by Jason Schulze

1 Comment

The quality and safety of heat treatment products are imperative. Because of this, the National Aerospace and Defense Contractors Accreditation Program (Nadcap) has clear and stringent guidelines for accreditation, which can often be challenging to attain. In this blog, I outline the step-by-step process for suppliers to gain Nadcap approval.

Read More Gaining Nadcap Approval | Conrad Kacsik

How to Perform Temperature Uniformity Surveys

Sep 25, 2018 9:17:44 AM / by Jason Schulze

0 Comments

Ensuring that a furnace can perform repeatable and accurate cycles is a cornerstone of AMS2750E pyrometry specifications as well as Nadcap and CQI-9 standards. The best way to measure and test any furnace is through a temperature uniformity survey (TUS).

Read More How to Perform Temperature Uniformity Surveys

Understanding AMS2750E Concepts | Conrad Kacsik

Sep 11, 2018 2:42:43 PM / by Jason Schulze

1 Comment

When it comes to pyrometry and thermal processing, details are critical. Adhering to the exacting AMS2750E standard demands that each step of heat treating meets specific requirements for sensors, instrumentation, equipment, tests and other details.

Any confusion in terminology can cause missteps that lead to audit findings, and this is particularly true when it comes to temperature uniformity surveys as applied to AMS2750E.

Read More Understanding AMS2750E Concepts | Conrad Kacsik

How to Find the Right Vacuum Furnace Control System

Aug 6, 2018 2:20:40 PM / by Conrad Kacsik posted in Control Systems, Industrial Control Panels

0 Comments

A vacuum furnace control system is a major capital investment that affects every aspect of your thermal processing capabilities, so choosing the right system can feel like a daunting task. It doesn’t have to. Simply follow these guidelines to ensure you get a vacuum furnace control system that meets your needs and delivers exacting and reliable performance.

Read More How to Find the Right Vacuum Furnace Control System

SCADA Control Panel Investment

May 18, 2018 10:02:14 AM / by Conrad Kacsik

0 Comments

Supervisory control and data acquisition (SCADA) is a system of hardware and software that allows manufacturers to precisely control and monitor a variety of industrial processes. Implementing SCADA can seem daunting, but these SCADA control panel systems offer a lot of compelling advantages.

Here are a few reasons to stop thinking about SCADA and move forward with implementation.

Read More SCADA Control Panel Investment

Meeting Nadcap Compliance Requirements | Conrad Kacsik

May 11, 2018 10:56:16 AM / by Conrad Kacsik

0 Comments

The National Aerospace and Defense Contractors Accreditation Program (Nadcap) has clear and stringent guidelines for accreditation. One area that often causes problems is the incorrect handling, formatting and storage of data. The good news is that there is a clear list of Nadcap certification requirements, and by installing the right equipment and following some basic steps, meeting these data demands is simple.

Read More Meeting Nadcap Compliance Requirements | Conrad Kacsik

Nadcap Audit Checklist: How to Avoid Non-Conformance Reports

Dec 21, 2017 11:23:00 AM / by Conrad Kacsik posted in Nadcap

0 Comments

Meeting Nadcap certification requirements and avoiding non-conformances in audits is a complex and challenging process, but it doesn’t need to be intimidating.

Read More Nadcap Audit Checklist: How to Avoid Non-Conformance Reports

5 Signs You Should Reinvest in Your Control Instrumentation

Nov 14, 2017 2:10:00 PM / by Conrad Kacsik

0 Comments

Very few plant managers think about their thermal process control systems unless there are obvious signs of problems or fallout from a failed audit. 

Read More 5 Signs You Should Reinvest in Your Control Instrumentation

Conrad Kacsik Establishes New Division to Assist with Nadcap

Aug 24, 2017 2:18:43 PM / by Conrad Kacsik posted in Company News

0 Comments

Conrad Kacsik Instrument Systems, Inc. is proud to announce the establishment of a Division dedicated specifically to assisting customers with their Nadcap and CQI–9 compliance processes.

Read More Conrad Kacsik Establishes New Division to Assist with Nadcap